|
Projects - Field House / Gyms / Stadiums
Patrick D. Cupp Stadium - A multi-use stadium completed in 2003, it is the largest soccer/track facility in the Big South Conference located in Radford, Virginia on the campus of Radford University. Cupp Stadium seats 5,000 with a roof over the premium seats. The stadium is used by Radford's soccer and athletics teams.
|
Wilson Memorial / Stuarts Draft Schools - Fishersville / Stuarts Draft, Virginia Two almost identical schools totalling $35 million comprising new gymnasiums, locker rooms, cafeterias, administration areas and science wings, about 84,000 sf total and extensive renovations to existing schools, about 226,000 sf total. All construction is single-story steel framed and/or masonry bearing wall. Honor Award for Excellence - Central VA Chapter of the AIA
|
Cougar Upper Elementary School and Pre-K Addition - Manassas, Virginia $30 million 10,500 sf single-story, pre-kindergarten building and 121,000 sf three-story, steel-framed building with classrooms, administrative, media, cafeteria, gymnasium, etc. Concrete deck on steel bar joists, braced frame extensive reinforced concrete retaining walls, conventional foundations, storm water management structures LEED Certified Project. Honor Award: James River Green Building Council
|
Freedom High School - South Riding, Virginia - $29+ million steel-framed structure and load bearing masonry designed to provide the community use of 450-seat cafeteria, 1000-seat auditorium (fine arts center), 2,250-seat competition track and lighted football field, 400 seat baseball and softball fields as well as six tennis courts.
|
Briar Woods High School - Ashburn, Virginia - $26 million steel-framed structure and load bearing masonry designed to provide the community use of 450-seat cafeteria, 1000-seat auditorium (fine arts center), 2,250-seat competition track and lighted football field, 400 seat baseball and softball fields as well as six tennis courts.
|
Daniel Morgan Middle School - Winchester, Virginia - $25 million 140,000 sf addition of a new gymnasium, cafeteria, administration area, and a two-story classroom wing. 135,000 sq. ft of renovations. Distinguished Design Award - VA School Boards Assoc. Exhibition of School Architecture and People's Choice Award - VA School Boards Assoc. Exhibition of School Architecture and Merit Award Middle School - Council of Ed. Fac. Planners VA Chapter
|
Manassas Park Middle School - Manassas Park, Virginia - $18 million 120,000 sf new construction with separate maintenance, gymnasium, and academic buildings. Construction type is pre-engineered metal building, bar joist and concrete deck and composite construction on steel frame. Features long span plate girders supporting library and trusses over about 25,000 sf of renovated space. Honor Award for Excellence - Central VA Chapter of the AIA and Merit Award for Renov.
|
Poquoson Elementary School - Poquoson, Virginia - $17.5 million new 90,000 sf elementary school with gymnasium, cafeteria, and media center. Steel frame on bearing masonry with butterfly roof over gymnasium in wood and steel. LEED Certified Project. GoGreen Design Merit Award: James River Green Building Council, Design Concept Award - Council of Ed. Fac. Planners, Int'l, and Recognized Value Award - Design Share Award
|
Manassas Park High School - $11.2 million new high school, approximately 110,000 sf, on three levels. Includes large gymnasium and round 400-650 seat, multi-purpose auditorium. Structural steel frame, masonry infill, concrete on metal deck.
|
Brownsville Elementary School - Crozet, Virginia - $8.2 million 31,950 sf single-story, steel frame addition consisting of two classroom wings, café addition and a pre-engineered steel building, gymnasium with a mechanical mezzanine. LEED Registered Project.
|
Stafford County Schools - (AG Wright and Stafford Middle School) Stafford Middle School Gym Addition (3 mil cost): The addition was a freestanding one-court gym and an attached weight room consisting of about 7,000 sf. The structure was load bearing CMU walls and open-web bar joists for the roof AG Wright Middle School Classroom Addition (5 mil cost): The addition consisted of science labs and a media center. The structure was load bearing CMU walls and open-web bar joists for the roof. The addition contained about 14,800 sf.
|
Greene County William Monroe Middle / High School - $8 million, 40,000 sf of expansion of classrooms for both the high school and middle school, expansion of the high school media center, cafeteria, and a new competition gymnasium. The high school classroom addition is a two-story steel-framed structure. The gymnasium is steel framed and designed for future expansion.
|
Charlottesville Boy's and Girl's Club - This new, two level recreation center is 24,000 sf set into the side of a hill. The facility has a gym on the lower level with classrooms and activity rooms on the main level. The structure is a steel frame with masonry exterior walls. The masonry walls act as shear walls.
|
Gallison Hall Pool and Tennis Additions - Charlottesville, Virginia - $6 million new indoor pool pavilion and tennis buildings at this private residence, including extensive landscape retaining walls.
|
Buffalo Gap High School Addition - Augusta County - $5.5 million addition of 35,000 sf of new space plus 12,000 sf gymnasium. Renovation of the existing building.
|
Farmington Country Club Renovation - $5 million renovation, alterations, and additions to existing club. New multi-purpose fitness center. Concrete on metal deck, joints and beam framing, custom wood.
|
Clements Middle School Additions and Renovations - Prince George County - $5 million complete renovation of existing school with 39,000 sf of new additions including a science wing and gymnasium.
|
James City County Recreation Center - Williamsburg - $5 million steel frame structural system for this 52,000 sf renovation/addition to the existing recreation center. Field house has full-size basketball courts and suspended running track.
|
Averett University Convocation Center - Danville, Virginia - $4 million new 56,000 sf convocation center. Encloses three full-size basketball courts.
|
Cub Scout Camp - Goochland, Virginia - $3.5 million 13,000 sf, new "themed" scout camp consisting of main lodge, nature center, shower/pool house (castle), residences (western fort and indian tepees), pirate ship, and camp buildings constructed of glulam, conventional wood framing or CMU.
|
Radford University Track & Soccer Stadium - $3 million new soccer stadium and two-story support building below with locker/training rooms. Basement/field level with offices and public restrooms.
|
UVA Baseball Stadium - $3 million renovation and expansion of current baseball field. Includes a 1,600 seat canopied grandstand, new stadium lighting, locker room, clubhouse, pressbox, and concession area.
|
Farmington Country Club Pool and Locker Room - $1.6 million project in Charlottesville, Virginia
|
|
|